Over a decade ago LK Valves & Controls won a contract to supply a complete ship sets of valves to three 70 ton bollard pull Voith Schneider propelled tugs.
The image above shows the second tug, leaving the construction hanger for the first time. It was towed to a floating dock which was used the following morning to launch the vessel by lowering it into the water.